MEPCO New Connection
You may face various issues seeking mepco electricity new connection by the traditional way of visiting physical offices. But now you can apply for a mepco new connection through an online electricity new connection ENC system, an online portal for the general public of Pakistan.
By visiting the ENC website you will see the above interface of the online system. Here you must put the requisite information in the fields, like electricity connection category type, power distribution company name, etc. Now upload the scanned copies of the required documents and apply for the new connection. you can also track the mepco bill new connection status.
Mepco New connection online apply procedure
You do not need to worry about applying for a Mepco new connection. Because applying for electricity new connection is very simple and easy. you can now do the same process even from the comfort zone of your home. The following guidelines will help you acquire Mepco new connection.
During the application for a new connection, make sure you provide the correct information. In case of wrong or concealed information, Disco reserves the right to reject or cancel your application form at any stage and will take legal action against you. Therefore be careful while applying for a new connection.
Documents Required for Industrial Applicants
While applying for a new electricity connection for your Industry, make sure to submit the following documents.
On successful submission of the online application. You will be given a tracking ID number for your mepco new connection. With the help of this ID, you can check the mepco new connection tracking. Just go to the mepco official website and enter your tracking ID or CNIC number by clicking the new connection tab. You will see your mepco new connection application status. If you feel any difficulty or you want to complain about any issue, you can contact the complaint management center or helpline.
Estimated Time Duration for New Connection
One always worries before applying how long will it take to install an electricity connection. But now you should not be worried about that because mepco has categorized the time duration based on power load. The time duration for your new meter installation depends upon the category of your connection. There are three categories of electricity connections provided by the power distribution company. Let us overview it.
Category – 1 Connection (Load up to 15 KW)
If your electricity connection falls under Category 1, then your mepco new connection requires 30 days to complete the process. The concerned SDO/AMO approves the provision of connection.
Category – 2 Connection (Load 16 to 70 kW )
If your electricity connection falls under Category 2, the process takes 44 days to complete. The rest of the process of this category is the same as category-1.
Category – 3 Connection (Load 71 to 500 kW )
You will have to wait 73 days if your connection falls under category 3. The entire process of this category is also the same as both of the above categories. The time duration is counted from the date of registration of your application for a new connection till the date of installation of the electricity meter.
New Electricity Connection Fee
Mepco new connection demand notice fee depends upon many factors. Such as the type of electricity connection category and power distribution company. The new connection fee does not remain constant as it changes with the fluctuation in the electricity charges and taxes. However, the residential or domestic meter connection fee is Rs. 5000 for the current year.
Electricity charges and taxes are levied by NEPRA keeping in view the fluctuation in prices of fuels in the market. You can pay the new connection demand notice fee in any bank branch designated by the power distribution company.
After depositing new meter charges, make sure to submit a copy to the office for further action.
You can check your mepco new connection application tracking by visiting http://enc.com.pk. Put your tracking ID assigned to you while applying for a new connection. Select “mepco” from the drag-down list of power companies. Your mepco bill new connection status will appear. If you want to check your mepco bill online. click the below button
Conclusion
Applying for a new MEPCO electricity connection has become much more convenient with the introduction of the ENC online system. This user-friendly portal allows you to complete the entire process from the comfort of your home, eliminating the need to visit physical offices. By following the simple steps outlined above and ensuring that all required documents are correctly submitted, you can seamlessly apply for and track your new connection. Whether for residential, commercial, or industrial purposes, the ENC system simplifies the application process, making it faster and more accessible for everyone